Our heating contractors returned this past week to install the red heating tubes in the house main floor + upper bathroom. In preparing for the wood stove installation we've also had to layer metal strap and concrete board under where the stove will be installed. Things are now ready for the 1-1/2" layer of concrete which should happen sometime this coming week.
We also passed the electrical inspection on Friday at 5:00 pm! Insulation and Drywall on their way soon!