The red heating tubes in the house have now been covered with 1-1/2" of fibre-reinforced concrete which will make a perfect surface to cement the tiles on to.  The pumper truck arrived at 7:20 am and the concrete truck at 7:45 so we were already to begin pouring (spewing) at 8:00 am. Our cement finisher, Brian Allen and his crew worked until 11:30 screeding, floating and troweling the floor for the final finish.