Karen fits Shop Doors
With the smaller passage doors installed, efforts have turned to the big 4' shop doors which have been hung, marked, removed, re-hung, checked, removed, had hardware installed and are now awaiting finishing before their final installation.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
►
2013
(2)
►
February
(2)
►
2012
(14)
►
December
(1)
►
October
(1)
►
September
(2)
►
August
(5)
►
July
(3)
►
May
(2)
►
2011
(25)
►
December
(3)
►
October
(3)
►
August
(3)
►
July
(2)
►
June
(2)
►
April
(4)
►
March
(1)
►
February
(1)
►
January
(6)
►
2010
(54)
►
December
(4)
►
October
(2)
►
September
(1)
►
August
(7)
►
July
(5)
►
June
(7)
►
May
(6)
►
April
(6)
►
March
(7)
►
February
(4)
►
January
(5)
▼
2009
(82)
►
December
(4)
►
November
(11)
▼
October
(13)
Stapling Paper in the Air
Installing Chimneys in the Rain
Concrete in the House
Home Sweet Trailer gets a Veranda Cover
Workshop-Garage Doors all on
Red Tubes in House Floors
Karen fits Shop Doors
Doors Getting Installed
Copper in the Walls
Second Bobcat Visit
Windows, Big Curve, and Successful Framing Inspection
Bobcat Visit
Roof and Gutters Nearly Complete
►
September
(3)
►
August
(6)
►
July
(7)
►
June
(10)
►
May
(11)
►
April
(6)
►
March
(11)
No comments:
Post a Comment