Sunday, May 3

Things You Don't Want to Forget






This weekend's visit shows lots of the little details that have to happen before the foundation backfilling begins.  Daryl, Dean and Cory have been getting the perforated perimeter drains and rain water leader pipes in and hooked up as well as:
  • Main electrical wiring from where it enters the shop to both the the mechanical room and on into the house.
  • Preparing the pipe for the hot water and electrical lines for the in-floor heat from the boiler location in the Shop-Garage to the house.
  • Electrical and water lines from the mechanical room to the well pump (out front) and more electrical lines to the septic areator (out back)
  • Water drains from areas under the boiler and hot water tanks in both Shop and House.
  • Toilet and sink sewage lines to the septic tank.

No comments: