Heating tubes in Garage
Our heating specialist, Jim Reynolds and his crew have been busy today placing the heating tubes ready for the first slab which is to be poured on Saturday. Daryl's crew have prepped the sand backfill adding the trench for the dust collection pipes in the workshop and placing the 2-1/2" styrofoam and wire mesh in preparation for the concrete.