Friday, August 5

Rock Wall - Slow Progress




With work on the deck being the main focus, the rock wall project has been neglected a little, but I have now placed the line of the biggest rocks to set the wall location and located the perforated drainage line. The current step is to screen the backfill to obtain some drain rock (1/2" dia+) and locate it on the pipe. Thank heavens the wall is only 120' long as interest declines as the thermometer rises.

Saturday, July 16

Trees Out - Rocks In









Another project planned for this summer is to tidy up the bank opposite our garage/workshop and use all of the remaining rocks gathered from around the property to build a thigh-high rock wall that incorporates a cedar trellis. Step 1 was to have our new friend Ryan from Ryno Bobcat visit with his Bobcat, Excavator and Dump Truck. Within a very short time, Ryan removed the 9 old pine tree stumps, re-shaped the bank, leveled various piles of dirt on the property, dug a few more holes for upcoming projects, delivered 6 yards of driveway crush & 6 yards of topsoil and rounded up every possible rock to be found on the whole 2 acres.

July: All Hands on Deck






The first two weeks of July (holiday) has been spent prepping the area around the house under the veranda for a raised wooden deck. The overall plan has been to place concrete footings which have pressure treated 4 x 4's set on them, along with a pressure treated 2 x 4 fastened to the house foundation with concrete anchors. The 2 x 6 joists have then been fastened between the wood on the house wall and the 4 x 4's making way for the fir decking which is almost ready to install.

Sunday, June 19

Column Caps






Over a year ago, we built a form and went through a routine of casting some caps for our rock columns. Finally, last weekend I got around to renting the gas-powered miter saw again and making the final 56 cuts. While the saw cooled off in an hour or so, it took me several days to recover. This past week, the caps were mortared on to the columns and ground smooth.

Post 150 - Rocks-On





The latest project has been tidying up the concrete foundation around the workshop-garage building. We've been saving rocks of all sizes to stack up and give the "rising out of the ground" look, which looks pretty good and actually, happened pretty fast.

Saturday, April 16

Kitchen Cabinet Drawers





The drawer fronts are made of plywood edged with solid Cherry and slip-matched cherry veneer on the fronts and maple veneer on the backs. The decorative diamond inlays were salvaged from an old table I made for an exhibition ten years ago. They will be used for a few other decorative kitchen details and on some of the window trim throughout the rest of the house. Stay tuned!

Kitchen Cabinet Doors





All of the lower kitchen cabinet doors have now been completed, finish applied and successfully installed. The frames are 3/4" x 1-3/4" cherry and the visible panels are MDF painted with 'Cancun Sand' semi-gloss. There is also a 1/4" thick maple ply backing to give the black backing to the diamonds. We hung the doors to the cabinets with soft-close hinges so no matter how heated things get in the kitchen, it is impossible to slam a door or drawer.