Saturday, July 16
July: All Hands on Deck
The first two weeks of July (holiday) has been spent prepping the area around the house under the veranda for a raised wooden deck. The overall plan has been to place concrete footings which have pressure treated 4 x 4's set on them, along with a pressure treated 2 x 4 fastened to the house foundation with concrete anchors. The 2 x 6 joists have then been fastened between the wood on the house wall and the 4 x 4's making way for the fir decking which is almost ready to install.