It is very shocking to realize that somehow the month September slipped by without a ingle blog update, although we've been very busy evenings and weekends. The rock wall was gradually built by adding a few every day after school and now measures 150' long and 27" tall. We've backfilled the area behind with a nice mix of chipped branches from last spring, compost mix and sifted soil that was dug back from the bank.
Thursday, October 20
Rock Wall Progress
It is very shocking to realize that somehow the month September slipped by without a ingle blog update, although we've been very busy evenings and weekends. The rock wall was gradually built by adding a few every day after school and now measures 150' long and 27" tall. We've backfilled the area behind with a nice mix of chipped branches from last spring, compost mix and sifted soil that was dug back from the bank.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment